Skip to content

Read-only version: For security reasons, the Research Information System (FIS) has been temporarily replaced by this read-only version. All public content and full texts remain available; login, editing, submission and statistics are not available. Questions: fis@uni-bamberg.de

Home › Publications › Short-Term Electricity Load Forecasting Using the Temporal Fusion Transformer : Effect of Grid Hierarchies and Data Sources

Publication

Short-Term Electricity Load Forecasting Using the Temporal Fusion Transformer : Effect of Grid Hierarchies and Data Sources

Giacomazzi, Elena; Haag, Felix; Hopf, Konstantin (2023): Short-Term Electricity Load Forecasting Using the Temporal Fusion Transformer : Effect of Grid Hierarchies and Data Sources, in: Bamberg: Otto-Friedrich-Universität.

Details

Faculty/Chair
Faculty/Professorship
Author
Giacomazzi, Elena
Hopf, Konstantin
Publisher Information
Otto-Friedrich-Universität : Bamberg
Year of publication
2023
Pages
8
Source/Other editions
Proceedings of the 14th ACM International Conference on Future Energy Systems - New York : ACM, 2023, S. 353–360. - ISBN: 979-8-4007-0032-3
Year of first publication
2023
Language
English
Licence
URN
Abstract

Recent developments related to the energy transition pose particular challenges for distribution grids. Hence, precise load forecasts become more and more important for efective grid management. Novel modeling approaches such as the Transformer architecture, in particular the Temporal Fusion Transformer (TFT), have emerged as promising methods for time series forecasting. To date, just a handful of studies apply TFTs to electricity load forecasting problems, mostly considering only single datasets and a few covariates. Therefore, we examine the potential of the TFT architecture for hourly short-term load forecasting across diferent time horizons (day-ahead and week-ahead) and network levels (grid and substation level). We fnd that the TFT architecture does not offer higher predictive performance than a state-of-the-art LSTM model for day-ahead forecasting on the entire grid. However, the results display signifcant improvements for the TFT when applied at the substation level with a subsequent aggregation to the upper grid-level, resulting in a prediction error of 2.43% (MAPE) for the best-performing scenario. In addition, the TFT appears to ofer remarkable improvements over the LSTM approach for week-ahead forecasting (yielding a predictive error of 2.52% (MAPE) at the lowest). We outline avenues for future research using the TFT approach for load forecasting, including the exploration of various grid levels (e.g., grid, substation, and household level).

GND Keywords
Elektrizitätsversorgungsnetz
Prognoseverfahren
Neuronales Netz
Keywords
Short-Term Load Forecasting
Artifcial Neural Networks
Temporal Fusion Transformer (TFT)
Long-Term Short-Term Memory (LSTM)
DDC Classification
004 Computer science
333.7 Natural ressources, energy, environment
RVK Classification
ST 340
Peer Reviewed
yes
International Distribution
yes
Open Access Journal
no
Type
Conferenceobject
URI
Activation date
2023-08-07
Project(s)

Permalink: https://fis.uni-bamberg.de/handle/uniba/89942 · Data as JSON · Cite: BibTeX · RIS

Data as of: 2026-11-16

Restricted read-only access: login, editing and submission are temporarily disabled.